Seven drawings for the people who have to live with the decisions — engineers, architects, co-investors. Each one shows a mechanism the prose can only describe: where the wind goes, where the water goes, what stops the salt, when the money moves.

01 — El Sistema

Wind, water, stone.

SECTION THROUGH ONE ZOCO · LA GERIA picón · 1–2 m of black lapilli TRAPS NIGHT DEW, RELEASES IT BY DAY zoco DRY STONE · 1.0–1.5 m malvasía vine IN THE SOCO · THE LEE alisio NNE · 13 kt mean, 27 kt gusts deflected over the pit night dew to the roots, no irrigation
The zoco: a wall, a pit, a vine, no waterThe crescent wall takes the trade wind and lifts it over the pit; the black lapilli in the pit condenses dew at night and gives it back by day. Three hundred years of vines grown with no rainfall to speak of. The estate is the same drawing at a larger scale: the wall is the compound wall, the vine is the guest.
NEW HYBRID WALL · BUILD-UP B · 545 mm · PLAN VIEW110 mm40 mm140 mm100 mm25 mmLava stone skinDrained cavityWood fibreCLT panelLime plasterOUTSIDESALT · WINDINSIDE21 °C · QUIETsalt spraywater drains down the cavityvapour breathes out through limeWORKING STRESS < 0.3 MPa · BASALT 200–350 MPa · GEOMETRY GOVERNS, NOT STRENGTH
Build-up B: stone outside, timber inside, lime on the faceSalt stops at the stone skin and drains down the cavity; the wood fibre and CLT carry the load and the insulation; lime plaster lets vapour out instead of trapping it, which is the whole reason cement render fails on this coast. Steel appears only where tension appears.
WATER ON THE ESTATE · NO AQUIFER Desalinated mainsISLAND SUPPLY Roof · lime screedRAIN, WHEN IT COMES Aljibe · 60 m³LIME-LINED CISTERN Four keys · poolUSE DepuradoraON-SITE TREATMENT Lava gardensTREATED WATER ONLY fills tops up supplies grey + black water irrigates THE GARDEN ITSELF IS DRY-FARMED: PICÓN, CACTUS, AGAVE. NOTHING ON A TIMER.
Where the water goesTwo sources in, one cistern, one use, one treatment, and the only irrigation on the plot is the water that has already been used once. Design targets to be confirmed by the services engineer.
ENERGY · SOLAR-LED, NOT OFF-GRID PV · 20 kWpROOF-INTEGRATED Battery · 40 kWhNIGHT LOAD GridBACKUP, NOT BASE Four keys Pool heat pumpSOLAR HOURS ONLY · THERMAL COVER La Pista LEDMATCH / DINNER / BLACKOUT charges when the battery is flat daytime surplus → pool BUDGETED WITHIN €165,000 SITE INFRASTRUCTURE, TRANCHES 1–2 · TARGETS, NOT MEASUREMENTS
Where the power comes fromThe roof charges the battery and runs the pool in daylight; the battery runs the night; the grid is behind both. The court's lighting is zoned so that a dinner or a film does not light a match.
FOUR OUTDOOR ROOMS · WHO HAS THE SUN WHEN Casa Madre El PatioMORNING El EstanqueAFTERNOON La PiscinaALL DAY La PistaEVENING 08:00 13:00 18:00 wind from NNE, behind the house NO TERRACE SEES ANOTHER · FOUR PARTIES OUTSIDE AT ONCE · THE RATE IS SET OUTDOORS
Four terraces, four times of dayThe plan is a sundial: each outdoor room catches its own hour and faces its own way, so the estate can be let four ways without anyone competing for a chair. The court takes the evening because its light is the only light on the plot.
02 — El Negocio

Court, capital, name.

THE COURT PLATFORM AND ITS FIVE ZONES · INDICATIVE, PENDING SETBACK SURVEY 1 · La Pista · 20 × 10 mENCLOSED · FLOODLIT · SERVICED 2 · Explanada SurDINING · CINEMA · MARKETS 3 · Terraza OesteMORNING · YOGA 4 · Mirador EsteDARK SKY · LOUNGERS 5 · Perímetro Norte · wind buffer + service spine3-PHASE POWER · WATER · SOUND alisio NNE ≈ 45 m to the nearest bed · acoustic orientation REMOVABLE NET POSTS IN FLUSH SOCKETS · DOUBLE-WIDTH GATE · SHADE-SAIL ANCHORS · ALJIBE PRICED UNDER THE SLAB
One slab, nine programmesThe court is specified as a level, serviced platform first and a padel court second, so it survives a change of use. The service spine sits on the windward side, the noise goes south and east, away from the beds.
HOW €1.80M ARRIVES · EACH TRANCHE RELEASES ONLY ON ITS GATE Principal€660k · 55% EQUITY Co-investors ≤ 2€540k · 30% Senior debt€600k · 33% · ~70% LTV Gate 1WRITTEN LICENCE OPINION Gate 2CAMPAIGN A TOPPED OUT Gate 3COURT CONSENT · 2 QUARTERS T1 · €1,050,000PLOT · MAIN HOUSE · SERVICES T2 · €545,000CASITAS · POOL · GARDENS T3 · €205,000COURT · POND · KITCHEN Y0 Y1 only against a permitted asset releases releases releases A "NO" AT GATE 1 COSTS ≈ €20,000 OF DUE DILIGENCE, NOT €1.8M · DOWNSIDE €1,705,000 IF THE COURT IS REFUSED
The gates are the risk controlMoney does not move until the written answer does. The principal goes first, co-investors follow at Gate 2, and debt is raised only once the asset is permitted. A refusal at the first gate leaves €1.78M unspent.
BRAND ARCHITECTURE · WHAT FLOWS BETWEEN THE LAYERS EL SOCOTHE STANDARD · THE MARK · THE LICENCE DEVELOPED BY FREST · BUILDER OF RECORD El Soco FincasFINCA DEL FUEGO · 02 · 03 Club El SocoLA PISTA · CAMPS · MEMBERS El Soco CapitalCO-INVESTORS · WEEKS + SHARES sets the standard runs the programme sponsors court weeks NOI and exit return to the capital Ring III · third-party estates under licence · fee on cost + royalty on gross + Frest build contract
The house brand and what it ownsEl Soco owns the standard and lends its name downward; the estates produce the income, the club produces the uplift, the capital vehicle carries the co-investors. Frest is the endorser and the builder. Ring III is the licence line that turns the name into the asset.

Every drawing carries design targets, not measurements. Wall thicknesses, water and energy figures and zone areas are assumptions for testing, to be replaced by the ground survey, the services engineer and the QS before Tranche 1.